The project included the reclamation, drainage and irrigation of a 20.000 ha. land reserved for the jute cultivation with insitu concrete paved main and some secondary irrigation canals as well as secondary and tertiary canals made of elevated precasts flumes with irrigation pump station of 6 pumps, each with a discharge capacity of 3.2 cum/sec and a drainage pumping tation with 7 pumps, each with a discharge capacity of 1.1 cum/sec, land leveling, 65 km asphalt road.